RFI vs submittal: what’s the difference?
Rev. November 24, 2026Short answer. An RFI asks the design team a question about the documents. A submittal asks the design team to review what the contractor plans to install: shop drawings, product data and samples. RFIs clarify the design; submittals confirm the contractor’s products and details meet it.
| RFI | Submittal | |
|---|---|---|
| Purpose | Clarify the drawings, specs or contract | Show what will be built or installed |
| Started by | A question in the field or office | A spec section that requires one |
| Contents | A question, references, suggested answer | Shop drawings, product data, samples |
| Answer | An answer | Approved, approved as noted, revise and resubmit, rejected |
| Tracked by | RFI log | Submittal log and register |
Can an RFI become a submittal?
Sometimes the answer to an RFI requires a new or revised submittal, for example a different product. Link the two so the reason is traceable.
Comparing tools? See which RFI software fits a GC, and what the RFI plan costs →
Asked often
- Do RFIs and submittals use the same software?
- In most construction project management software, yes: both sit in the same project with the same drawings and ball in court.